Within the scope of the Asian Region 10th Section Wastewater, Stormwater Canal and Stream Rehabilitation contract, approximately 56.0 km of concrete/reinforced concrete pipes with Ø300mm-Ø2000 mm diameters, wastewater and stormwater canal construction and prefabricated manhole elements and stormwater canal manufacturing will be carried out.
WE BUILD THE FUTURE
![Mesaj](/sites/default/files/inline-images/message-min.jpg)
WE'VE COMPLETED
![Bridge](/sites/default/files/2023-06/kopru-min_0.png)
1
Bridge
![Hydropower Plant](/sites/default/files/2023-06/hidroenerji-min_0.png)
3
Hydropower Plant
![Structure Project](/sites/default/files/2023-06/ustyapi-projesi-min.png)
11
Structure Project
![Substructure Project](/sites/default/files/2023-06/altyapi-projesi-min.png)
8
Substructure Project
Completed Projects
PROJELERİMİZ
Ongoning Project
PROJELERİMİZ
REFERENCES
![KOZA ALTIN MADENİ İŞLETMELERİ A.Ş](/sites/default/files/2023-08/koza-min.png)
![ARTUKLU BELEDİYESİ](/sites/default/files/2023-08/artuklu-min.png)
![KOCAELİ BÜYÜKŞEHİR BELEDİYESİ](/sites/default/files/2023-08/kocaeli-min.png)
![AFYON KARAHİSAR / ŞUHUT BELEDİYESİ FEN İŞLERİ MÜDÜRLÜĞÜ](/sites/default/files/2023-08/suhut.png)
![İLLER BANKASI A.Ş.](/sites/default/files/2023-08/ilbank-min.png)
![TC. ÇEVRE, ŞEHİRCİLİK VE İKLİM DEĞİŞİKLİĞİ BAKANLIĞI TOPLU KONUT İDARESİ BAŞKANLIĞI](/sites/default/files/2023-08/toki-min.png)
![MARDİN BÜYÜKŞEHİR BELEDİYESİ](/sites/default/files/2023-08/mardin-min.png)
![İSTANBUL SU VE KANALİZASYON İDARESİ GENEL MÜDÜRLÜĞÜ](/sites/default/files/2023-08/iski-min.png)
![DSİ](/sites/default/files/2023-06/dsi-min.png)
![KGM](/sites/default/files/2023-06/kgm-min.png)